Construction began on November 11, 2021, and was completed on February 11, 2022. It began accepting elderly residents on August 15, 2022. It was built on a 27,593.86 m² plot of land with a construction area of 4,159 m². The total enclosed area is 14,401 m², while the open area is 23,434 m². It is a 4-story stepped structure, including the basement. It has 119 beds and 59 rooms, with a total capacity of 150 elderly residents: 100 in the nursing home and 50 in the rehabilitation center. Room Types: Rooms are available for 1, 2, or 3 people. Additional facilities include a multipurpose hall (conference room), hobby rooms, social areas, administrative units, a restaurant, a cafeteria, landscaping, and walking areas.